Customer: Kongsberg Maritime AS
Description: B&G Turret Upgrade onboard Norne during 2024.
Project: Norne, North Sea
Year: 2024
|
|
|
Customer: Kongsberg Maritime AS
Description: Delivery of new Low Voltage Switchboards and Upgrade of Existing Main Switchboards and Motor Control Centers. Delivery, Installation and Commissioning of new Diesel Engine Control and Safety System. (3 Gensets)
Project: FSO Baleine
Year: 2024
|
|
|
Customer: Lürssen Yacht Refit And Services Gmbh & Co. KG
Description: Installation of new K-Chief, K-Trust and K-Bridge systems onboard Megayacht MY Rocinante at Lürssen Yacht in Germany. Loop testing and Commissioning.
Project: MY Rocinante
Year: 2024
|
|
|
Customer: Kongsberg Maritime AS
Description: Delivery of equipment for upgrade/replacement of all low voltage sections in Main High Voltage Switchboard. New Mounting Plates and Doors for replacment onboard during short Yard stay
Project: Allseas Fortitude
Year: 2024
|
|
|
Customer: BW Offshore Pte. Ltd.
Description: Condition Assessment of all electrical systems onboard FPSO OSX1 intendent for Repsol Block 29 FPSO Project.
Project: Repsol Block 29 FPSO Project
Year: 2024
|
|
|
Customer: China Merchants Heavy Industry (Jiangsu) CO., LTD
Description: Delivery of 6,6kV Shore Connection System for eight new Car Carriers built for Höegh Autoliners.
Includes Changover Switchboard, Control System and Socket cabinet.
Project: Höegh Autoliners, 6,6kV Shore Connection System
Year: 2023
|
|
|
Customer: Kongsberg Maritime AS
Description: Delivery of Low Voltage Switchboards for Kongsberg Maritime’s hybrid power solution for Allseas Solitaire, Fortitude and Audicia.
«Solitaire, one of the world’s largest and most sophisticated pipelay vessels, will be the first vessel to be fitted with Kongsberg’s PowerAllocatorTM energy storage solution. PowerAllocatorTM allows the engines to run at increased fuel efficiency and enables full flexibility in power system setups. Energy storage is available for spinning reserve and power peak load smoothing for all main redundancy groups in both open and closed bus operation»
Project: Allseas Solitaire, Fortitude and Audicia
Year: 2023
|
|
|
Customer: Bluegreen Fusion AS
Description: Electrical Installation and deliveries of cable, lights, junction boxes, earthing systems etc. to Bluegreen Fusions first Marine Donut. This is a closed fishfarm for end customer Salmar ASA.
Project: Marine Donut
Year: 2023
|
|
|
Customer: BW Maritime Pte Ltd.
Description: Major upgrade of FSRU Vessel BW Singapore. Engineering, delivery of >30 000 meter with cable, new Boiler Switchboard with VFD Drives and Softstarters. Delivery of new Shore Connection System. Delivery of 6,6kV 1800kW Softstarter for MSO Compressor. Upgrade of K-Chief Automation System.
Project: FSRU BW Singapore
Year: 2023
|
|
|
Customer: APL Norway AS
Description: Delivery of STP Control Cabinets and Distribution Cabinets for Submerged Turret Production System onboard on ot the worlds largest FPSO’s for the Barossa gas and condensate field located offshore of Australia.
Project: BW Opal
Year: 2022
|
|
|
Customer: Ocean Farming
Description: Several upgrades onboard Ocean Farm 1 (Fish Farm)
Project: Ocean Farm 1, Upgrades
Year: 2022
|
|
|
Customer: Aibel
Description: Delivery of Main Switchboards, Distribution Boards and with PMS System for High Speed Wavecraft vessels built at Umoe Mandal
Project: Wavecraft 28, Umoe Mandal Yard 24/25
Year: 2022
|
|
|
Customer: Pure Salmon Kaldnes
Description: Delivery of 3pcs 400V – 3200A Main Switchboards for worlds largest hatcheries for SalMar in Tjuin-Norway
Project: SalMar Settefisk – Tjuin
Year: 2022
|
|
|
Customer: SeaDream Yachtclub
Description: Total upgrade of all passenger cabins with complete new electrical equipment.
Project: SeaDream 1, Guest Cabin Upgrade
Year: 2022
|
|
|
Customer: Kongsberg Maritime
Description: Major Upgrade in Haugesund
Project: FPSO Haewene Brim
Year: 2022
|
|
|
Customer: Höegh LNG
Description: Major upgrade of FSRU vessel at Curacao
Project: FSRU Höegh Gallant, Upgrade
Year: 2021
|
|
|
Customer: BW Maritime Pte Ltd
Description: FSRU Conversion of LNG vessel 31BW Tatiana in Singapore
Project: BW Tatiana FSRU
Year: 2021
|
|
|
Customer: Kongsberg Maritime
Description: Upgarde of all Winch Consoles on one the worlds largest crane and pipelayer vessels
Project: Saipem 7000, Winch Console Upgrade
Year: 2021
|
|
|
Customer: International Maritime Services, Inc
Description: Delivery and Installation of Changeover Switchboard for Battery Pack Interface to Main Switchboard.
Installation of new Link Breakers in Main Switchboard. Cable delivery and Installation.
Project: PSV Stephen Wallace Dick, Hybrid Prosjekt, South-Korea
Year: 2021
|
|
|
Customer: Kongsberg Maritime
Description: K-Chief IAS System upgrade on pipelayer Deep Blue
Project: Deep Blue IAS Upgrade
Year: 2021
|
|
|
Customer: Kongsberg Maritime
Description: Delivery and Installation of Changeover Switchboard for Battery Pack Interface to Main Switchboard.
Installation of new Link Breakers in Main Switchboard.
Project: PSV Bailey Tide, Hybrid Prosjekt, South-Korea
Year: 2020
|
|
|
Customer: SeaDream Yachtlub
Description: Total upgrade of all passenger cabins with complete new electrical equipment.
Project: SeaDream 2 Passenger Cabin Upgrade
Year: 2020
|
|
|
Customer: BW Maritime Pte Ltd.
Description: Delivery, Installation and Commissioning of New 440V Main Switchboards and Motor Control Center for Regas Systems. Delivery, Installation and Commissioning of Watercooled Frequency Converters Submersible S.W. Pumps
Project: BW Tatiana FSRU Upgrade
Year: 2020
|
|
|
Customer: Salmar Settefisk
Description: Levering av Nødaggregat for Fiskeoppdrettsanlegg
Project: Nødaggregat for Fiskeoppdrettsanlegg
Year: 2019
|
|
|
Customer: Color Line
Description: Delivery and Installation of new UPS’s.
Emergency Light UPS
Navigation UPS
Data UPS
PABX UPS
IAS UPS
Project: Superspeed 2
Year: 2019
|
|
|
Customer: Color Line
Description: Delivery and Installation of new UPS’s.
Emergency Light UPS
Navigation UPS
Data UPS
PABX UPS
IAS UPS
Project: Color Magic
Year: 2019
|
|
|
Customer: Color Line
Description: Delivery and Installation of new UPS’s.
Emergency Light UPS
Navigation UPS
Data UPS
PABX UPS
IAS UPS
Project: Superspeed 1
Year: 2019
|
|
|
Customer: Kongsberg Maritime
Description: Miscelleneous Upgrades and Modifications
Project: Ocean Farm 1, Frøya
Year: 2018
|
|
|
Customer: Kruger Kaldnes
Description: Hovedtavler og Nødgeneratorer
Project: Follafoss Fiskeoppdrettsanlegg
Year: 2018
|
|
|
Customer: Golar
Description: Power Management System
Start/Stop Automatic for Diesel Engine
Project: Methane Princess
Year: 2018
|
|
|
Customer: Kongsberg Maritime
Description: Major Upgrade
New Automation System
New Power Management System
Main Switchboard Upgrades
Project: Megayacht Mayan Queen IV
Year: 2018
|
|
|
Customer: Kongsberg Maritime
Description: Installation of new Automation System, Power Management System, Boiler Mimik and Control System
Project: LNG Everett
Year: 2018
|
|
|
Customer: Ugland Marine Services
Description: Upgrade of CCTV System
Delivery and Installation of New Helideck Lighting System approved for North Sea
Installation of New Control System for Hipap
Installation of New Parker PMS System
Project: MT Vinland - Odense
Year: 2017
|
|
|
Customer: Kongsberg Maritime
Description: Delivery and Installation of New Winch Starters
Delivery and Installation of New LED Light Fixtures and Flood Lights
Thermographic Survey of Switchboards
Miscelleneous Upgrades
Project: Ocean Farm 1 - Frøya
Year: 2017
|
|
|
Customer: Kongsberg Maritime
Description: Installation of New Power Management System
Installation of New Automation System
Major Upgrade of Main Switchboards
Project: Megayacht Al Said
Year: 2017
|
|
|
Customer: Vard Electro Brevik
Description: Delivery of Main Switchboards and Electrical Shore Connection System
Project: Connect LNG. Jettyless LNG Transfer Platform
Year: 2017
|
|
|
Customer: Krüger Kaldnes
Description: Delivery of Main Switchboard
Delivery, Installation and Commissioning of 4pcs Genesal Emergency Diesel Generator Set
Project: Salmar Settefisk Follafoss Fiskeoppdrettsanlegg
Year: 2017
|
|
|
Customer: SeaDream Yacht Club
Description: Delivery and Installation of New CCTV System
Installation of New Ballast Water Treatement System
Thermographic Survey of Main Switchboards, Starter Cubicles, Distribution Boards and Engine Rooms.
Project: SeaDream 2 Lisbon
Year: 2017
|
|
|
Customer: Kongberg Maritime
Description: Installation of new Automation System, Power Management System, Boiler Mimik and Control System
Project: LNG Suez Boston Upgrade Ferroll
Year: 2017
|
|
|
Customer: Teekay
Description: Delivery of Manpower, Miscelleaneous Starter Cabinets and Distribution Boards
Project: Randgrid (Gina Krog) Upgrade, Singapore
Year: 2017
|
|
|
Customer: Colombo Dockyard PLC.
Description: Upgrade of Power Management System for Interface to new 6,6kV Main Switchboard and Propulsion System
Project: Samudra Sevak, Colombo - Sri Lanka
Year: 2017
|
|
|
Customer: Kongberg Maritime Engineering
Description: Production of Control System for the Worlds largest Offshore fishfarm with a diameter of 110m and overall height og 68meters.
Project: Ocean Farming Fish Farm
Year: 2016
|
|
|
Customer: SeaDream Yacht Club
Description: Major Upgrade after Fire Damage in Engine Room.
Replacement of Diesel Engines Control and Monitoring System
Replacement of Main Engines Control and Monitoring System
Major Overhaul of Generators
Replacement of Alarm and Monitoring System.
Replacement og 15000 meter with damaged cables in Engine Room and Casing.
Delivery and Mounting of CCTV System, Alarm Colums, Alarm Lights, Distribution Boards, Starter Cabinets, Engine Room Lights, Control System for Water Tight Doors.
Project: SeaDream I Upgrade - Naples
Year: 2016
|
|
|
Customer: Kongberg Maritime Engineering
Description: Delivery of CAAP Panel, Valve Interface Cabinets, Starter Cabinets ESD Cabinet, and Distribution Boards.
Project: Gina Krog FSO Upgrade - Singapore
Year: 2016
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation System
Project: Olympic Princess - Stril Poseidon - Stril Pioneer - Viking Energy
Year: 2016
|
|
|
Customer: Aibel
Description: Main Switchboards and Distribution Boards
Project: Wavecraft Project Hull 3 Umoe Mandal
Year: 2016
|
|
|
Customer: SeaDream Yacht Club
Description: Major Upgrade of Main Switchboard.
Replacement of Start/Stop/Shutdown Automatic for Diesel Engines
Replacement of Voltage Regulators for Diesel Generators
Thermographic Survey of Main Switchboards, Starter Cubicles, Distribution Boards and Engine Rooms.
Major Upgrade of Main Switchboard.
Project: SeaDream I Lisbon
Year: 2016
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation System, Safety System and Control Consoles.
Project: Crane Vessel Thialf Upgrade Rotterdam - Netherlands
Year: 2016
|
|
|
Customer: Bumi Armada Berhard
Description: Delivery of 6,6kV Switchboards, Transformers and JB for Shore Connection System
Delivery and Engineering of Ship-Shore Interface System
Modification of 440V Main and Emergency Switchboards.
Upgrade of Engine Alarm and Monitoring System.
Upgrade of Cargo Alarm and Monitoring System.
Upgrade of Cargo Control System
Upgrade of Gas Compressor Control, Alarm and Monitoring System.
Delivery of Motor Control Centers for new Boilers
Project: Armada LNG Mediterana FSU Upgrade Project - Singapore
Year: 2016
|
|
|
Customer: 2015
Description:
Project: 2015
Year: 2015
|
|
|
Customer: Kongberg Maritime Engineering
Description: Delivery of AVR Cabinets, Switchboards and Distribution Boards.
Project: Gina Krog FSO Upgrade - Singapore
Year: 2015
|
|
|
Customer: Kongsberg Maritime
Description: Replacing the Automation System, DP System, Safety System and Control Consoles
Project: Saipem 10000 Upgrade Genova - Italy
Year: 2015
|
|
|
Customer: GBA Marine
Description: CVOC Control System for Hyundai HN2816, HN2817, HN2818
Project: MT Lena Knutsen - MT Vigdis Knutsen - MT Tordis Knutsen
Year: 2015
|
|
|
Customer: Kongberg Maritime Engineering
Description: Rebuilding MV Samudra Nidhi from DP1 to DP2.
Engineering, Installation and Testing.
Project: Samudra Nidhi Upgrade Cuchin - India
Year: 2015
|
|
|
Customer: Aibel
Description: Main Switchboards and Bridge Control Console
Project: Wavecraft Project Hull 2 Umoe Mandal
Year: 2015
|
|
|
Customer: Kongsberg Maritime
Description: Replacing the Automation System, DP System, Safety System and Control Consoles
Project: GL 1200 Upgrade Rotterdam - Netherlands
Year: 2015
|
|
|
Customer: SeaDream Yacht Club
Description: Major Upgrade of Main Switchboard.
Replacement of Start/Stop/Shutdown Automatic for Diesel Engines
Replacement of Voltage Regulators for Diesel Generators
Thermographic Survey of Main Switchboards, Starter Cubicles, Distribution Boards and Engine Rooms.
Major Upgrade of Main Switchboard.
Project: SeaDream II Upgrade - Lisbon
Year: 2015
|
|
|
Customer: Kongberg Maritime
Description: Building of Cabinets for new Automation System.
Project: Crane Vessel Thialf
Year: 2015
|
|
|
Customer: Advanced Production and Loading
Description: Production of SDS Control System
Project: Catcher Project
Year: 2015
|
|
|
Customer: 2014
Description:
Project: 2014
Year: 2014
|
|
|
Customer: Aibel
Description: Main Switchboards and Bridge Control Consoles
Project: Wavecraft Project No.1 - Umoe Mandal
Year: 2014
|
|
|
Customer: WesternGeco
Description: Replaced the Automation System
Project: Geco Eagle - Gibraltar
Year: 2014
|
|
|
Customer: Advanced Production and Loading
Description: Motor Control Center for STL Control System.
Project: Mariner FSU
Year: 2014
|
|
|
Customer: Høegh LNG Fleet Management
Description: Delivery of High Voltage Transformers, modification of Cargo Pump Starters, Delivery of new Starter for Cargo Pumps and Re-Gas Boilers FD Fans.
Project: GDF Suez Neptune Upgrade - Ferrol
Year: 2014
|
|
|
Customer: Purenviro
Description: Delivery of Control System Cabinets for Scrubber plant
Project: Ewos Bergneset
Year: 2014
|
|
|
Customer: WesternGeco
Description: New Additional Main Switchboard and New CCTV System
Project: Western Neptune Mobile – USA
Year: 2014
|
|
|
Customer: 2013
Description:
Project: 2013
Year: 2013
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation System
Project: Saipem 3000 - Rotterdam
Year: 2013
|
|
|
Customer: WesternGeco
Description: New Additional Main Switchboard and New Main UPS System
Project: Western Trident Cape Town
Year: 2013
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation System
Project: Noble Discoverer - South Korea
Year: 2013
|
|
|
Customer: National Oilwell Varco APL
Description: Delivery of STP Control System Cabinets.
Project: Enping
Year: 2013
|
|
|
Customer: Xiamen Shipbuilding Industry Co.
Description: Main Switchboards and Motor Control Centers for Høegh Autoliners PCTC 8500 Car Carriers. 6 vessels
Project: Höegh PCTC 8500 A-B-C-D-E-F
Year: 2013
|
|
|
Customer: GBA Marine
Description: Delivery and Commissioning of Control Cabinets for CVOC System.
Project: Samsung HN2065/2066
Year: 2013
|
|
|
Customer: Ugland Marine Services
Description: Delivery, installation and Commissioning of new Power Management System and Start/Stop/Shutdown Automatic
Project: MV Uglen Upgrade Haugesund - Norway
Year: 2013
|
|
|
Customer: Kongberg Maritime
Description: Delivery, Installation and Commissioning for rebuilding of 230pcs motor starters to Intelligent starters.
Project: Scarabeo 5 Upgrade - Rotterdam
Year: 2013
|
|
|
Customer: Huwei Offshore Shenzhen
Description: Installation of new DP System
Project: Hua Ze Shenzhen
Year: 2013
|
|
|
Customer: WesternGeco
Description: Delivery and Mounting of CCTV System.
Project: Western Regent Upgrade Fredrikshavn - Denmark
Year: 2013
|
|
|
Customer: Wartsila Oil and Gas Systems
Description: Delivery of VOC Control Cabinets
Project: Heidrun FSU
Year: 2013
|
|
|
Customer: Ocean Rig
Description: Replaced the Automation Systems and Dynamic Position System
Project: SSDR Leiv Eiriksson Upgrade Ølen - Norway
Year: 2013
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation Systems and Bridge Control Consoles
Project: Saipem 7000 Upgrade Rotterdam
Year: 2013
|
|
|
Customer: 2012
Description:
Project: 2012
Year: 2012
|
|
|
Customer: WesternGeco
Description: Upgrading of Instrument Room.
Installation of new 400kVA UPS and Upgrading of UPS System.
Installation of new Chiller System.
Installation and Connection of Power Cables for re-located Propulsion Motors
Project: WG Magellan Upgrade Mobile - USA
Year: 2012
|
|
|
Customer: Ocean Rig
Description: Delivery, Installation and Commissioning of Bustie Section for existing Switchboard
Replaced the Automation Systems and Dynamic Position System
Project: SSDR Eirik Raude Upgrade Las Palmas - Spain
Year: 2012
|
|
|
Customer: WesternGeco
Description: Upgrading of Instrument Room.
Installation of new 400kVA UPS and Upgrading of UPS System.
Installation of new Chiller System.
Project: WG Vespucci Upgrade Durban – South Africa
Year: 2012
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation Systems
Project: Legend of Seas Singapore
Year: 2012
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation Systems
Project: Saipem FDS Upgrade Rotterdam
Year: 2012
|
|
|
Customer: Höegh Fleet Services
Description: Delivery and Commissioning of Ventilation Motor Control Centers for Autocarriers.
Project: Hull 4437 and 4438 Qingdao Beihai Shipbuilding China
Year: 2012
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation Systems
Project: Grandeur of Seas Upgrade Cadiz - Spain
Year: 2012
|
|
|
Customer: GBA Marine
Description: Delivery and Commissioning of Control Cabinets for CVOC System.
Project: Teekay Spirit Class Shuttle Tankers Samsung - Korea
Year: 2012
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation Systems
Project: Gryphon Alpha Rotterdam
Year: 2012
|
|
|
Customer: PGS AS
Description: Delivery, Installation and Commissioning of new ABB DC Drives for Main Compressors
Project: Pacific Explorer Upgrade, Perth - Australia
Year: 2012
|
|
|
Customer: Golar Management Oslo
Description: Delivery, Replacement and Commissioning of new Emergency Switchboard.
Delivery, Replacement and Commissioning of new Control Panel for Diesel Generator.
Project: LNG Hilli Upgrade Singapore
Year: 2012
|
|
|
Customer: Kongberg Maritime Engineering
Description: Delivery of new Motor Control Centers with Schneider Smart Starter Units.
Upgrade of Existing Main Switchboards.
Project: FPSO OSX-1 Nexus Project Singapore
Year: 2012
|
|
|
Customer: 2011
Description:
Project: 2011
Year: 2011
|
|
|
Customer: PGS AS
Description: Delivery, Installation and Commissioning of DC Drive for Bow Thruster Motor.
Project: Pacific Explorer Seismic Vessel Singapore
Year: 2011
|
|
|
Customer: Golar Management Oslo
Description: Engineering of electrical System for Rebulding of Golar Khannur to Floating Storage and Re-Gasification Unit. (FSRU)
Engineering and Delivery of 440V Switchboards, 6,6kV/450V Transformers. Commission and Start Up.
Delivery and Commissioning og High Duty Compressor Control Panels.
Rebuilding of Exisiting Main Switchboards and Cargo Pump Starters
Project: Golar Khannur West Java Project Singapore
Year: 2011
|
|
|
Customer: Høegh LNG Fleet Services
Description: Delivery, Mounting, Connection and Commissioning of new Emergency Switchbord.
Project: LNGC Matthew Ferrol - Spain
Year: 2011
|
|
|
Customer: WesternGeco
Description: Upgrading of Control System for Seismic Winches.
Project: Geco Eagle Seismic Vessel Fredrikshavn - Denmark
Year: 2011
|
|
|
Customer: Kongberg Maritime
Description: Delivery and Installation of I/O Cabinets for Automation System
Delivery of Fire & Gas Panel.
Project: BW Carmen
Year: 2011
|
|
|
Customer: Kongsberg Maritime
Description: I/O Cabinets
Project: Golar Khannur West Java Project Singapore
Year: 2011
|
|
|
Customer: PGS AS
Description: Delivery, Installation and Commissioning of Frequency Drives for Propulsion Motors.
Project: Pacific Explorer Seismic Vessel Singapore
Year: 2011
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation Systems and Dynamic Position System
Project: SSDR Leiv Eiriksson Tyrkia
Year: 2011
|
|
|
Customer: SeaDream Yachtclub
Description: Thermographic Survey of Main Switchboards, Starter Cubicles, Distribution Boards and Engine Rooms.
Maintenance of Main Switchboards and Transformers.
Project: SeaDream I Bremerhaven
Year: 2011
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Thruster Control System
Project: BB Troll
Year: 2011
|
|
|
Customer: WesternGeco
Description: Upgrading of Control System for Seismic Winches.
Delivery and Mounting of 2pcs 125kVA UPS for Instrument Room.
Delivery and Mounting of CCTV System.
Delivery and Mounting of Bender Earth Fault System for Monitoring of all 24V DC Circuits.
Project: Geco Triton Seismic Vessel Odense - Denmark
Year: 2011
|
|
|
Customer: 2010
Description: 2010
Project: 2010
Year: 2010
|
|
|
Customer: APL AS
Description: Delivery of STP Control System.
Project: BW Athena
Year: 2010
|
|
|
Customer: Kongberg Maritime
Description: Replaced the Automation Systems and Dynamic Position System
Project: Oceanic Viking
Year: 2010
|
|
|
Customer: Ugland Marine Services
Description: Delivery of new Control System for Main Cranes.
Project: MV Uglen Crane Vessel
Year: 2010
|
|
|
Customer: WesternGeco
Description: Upgrading of Control System for Seismic Winches.
Delivery and Installation of CCTV System.
Project: Western Regent Fredrikshavn
Year: 2010
|
|
|
Customer: Ugland Marine Services
Description: Replaced the Automation Systems and Dynamic Position System
Project: MT Vinland, Brest - France
Year: 2010
|
|
|
Customer: Kongsberg Maritime
Description: Upgrade of Engine Control System, Automation System, Power Management System.
Engineering, Delivery and Installation of new Control System for Azimuth Thrusters.
Project: MV Castoro 6 Pipe Layer Upgrade Rotterdam
Year: 2010
|
|
|
Customer: Kongberg Maritime Engineering
Description: Upgrading of DP, Automation and Control system
Project: MV Huapeng Hong Kong
Year: 2010
|
|
|
Customer: STX Electro
Description: Engineering of Main Switchboards and Emergency Switchboards for Supply Vessel.
Project: NB Hull 733
Year: 2010
|
|
|
Customer: WesternGeco
Description: Delivery and Installation of Bender Earth Fault System on the 24VDC System on all WesternGeco vessels.
Project: WesternGeco Fleet
Year: 2010
|
|
|
Customer: 2009
Description: 2009
Project: 2009
Year: 2009
|
|
|
Customer: Kongsberg Maritime
Description: Upgrading of Cargo Control System, Automation System, Power Management System, Gas Detection System and Ballast Control System.
Project: FSO Escravos Upgrade Cape Town
Year: 2009
|
|
|
Customer: WesternGeco
Description: Upgrading of Control System for Seismic Winches
Project: Western Monarch Mobile – USA
Year: 2009
|
|
|
Customer: Kongsberg Maritime
Description: Upgrade of Cargo Control System, Custody Transfer System and Ballast Control System.
Project: LNG/C EDO Upgrade, Ferrol - Spain
Year: 2009
|
|
|
Customer: Ugland Marine Services
Description: Delivery and Installation of new Control System for Azimuth Propellers and Tunnel Thrusters
Project: MV Uglen Crane Vessel
Year: 2009
|
|
|
Customer: CGG Veritas
Description: Delivery and Replacement of Frequency Converter for 2pcs 2500kW Main Propulsion Motors.
Project: CGG Amadeus Seismic Vessel Upgrade, Santander - Spain
Year: 2009
|
|
|
Customer: WesternGeco
Description: Upgrade of Control System for Seismic Winches
Project: Geco Emerald Upgrade Mobile - USA
Year: 2009
|
|
|
Customer: Golar Management Oslo
Description: Engineering of electrical System for Rebulding of LNGC Golar Winter to Floating Storage and Re-Gasification Unit. (FSRU)
Delivery, Installation and Commissioning of New Power Management System.
Project: FSRU Vessel Golar Winther Upgrade Singapore
Year: 2009
|
|
|
Customer: Höegh Fleet Services
Description: Delivery of new Power Management System and Upgrade of Main Switchboards.
Project: Suez Matthew Upgrade Brest - France
Year: 2009
|
|
|
Customer: GC Rieber Bergen
Description: Engineering and Replacement of Automation system. Delivery and Installation of Power Management System.
Project: MV CGG Venturer Seismic Vessel Fredrikshavn
Year: 2009
|
|
|
Customer: PGS AS
Description: Removal and installation of cables and equipment after Fire in Engine Room.
Project: Pacific Explorer India
Year: 2009
|
|
|
Customer: WesternGeco
Description: Upgrading of Control System for Seismic Winches
Project: Western Pride Namibia
Year: 2009
|
|
|